Preloader
Mishmash

Wonder Valley

Where the grid ends.

We begin.

Hero Background Poster

15 GW across two countries.
The largest data center platform, engineered for AI.

Contact Us

0.0 GW

Alberta

0.0 GW

Utah

10,000

Acres

2000

Shovel Ready

Built for What's Next

Wonder Valley is a
next-generation
compute platform
designed for the
demands of AI.

Two campuses, Alberta and Utah, delivering 15 GW of capacity across 26,000 acres of purpose-built infrastructure.

Integrated on-site power generation, water utility, and carbon-capture-ready design make Wonder Valley the most complete large-scale AI infrastructure platform in development today.

Minimized wasted energy at every stage of power production.
| 01

Resources Efficiency

Minimized wasted energy at every stage of power production.

Next-generation, low-water power and cooling. Built for sustainability at scale.
| 02

Water Resilience

Next-generation, low-water power and cooling. Built for sustainability at scale.

Power generation onsite
| 03

Natural Gas

Power generation onsite

Capture-ready design
| 04

Carbon Management

Capture-ready design

Location

Wonder Valley

Utah
Alberta

Alberta. Greenview Industrial Gateway

Grande Prairie, AB | 13,000 Acres | 7.5 GW

Utah. Stratos Project Area

Box Elder County, UT | 7.5 GW
Wonder Valley Alberta Mobile
Wonder Valley Alberta Mobile
Wonder Valley Utah 1
Wonder Valley Utah 2
Wonder Valley Alberta Mobile
| 01

| 02
Gas
arrow-thin

Major Interstate Natural Gas Infrastructure

Direct access to major interstate natural gas pipelines enabling large-scale, reliable, on-site power generation at highly competitive fuel costs.

Major Interstate Natural Gas Infrastructure
| 03
Defense & Tech
arrow-thin

Aerospace, Defense & Technology Ecosystem

Proximity to aerospace, defense, and advanced manufacturing ecosystems and active within the Silicon Slopes. Supports secure, high-performance computing for enterprise and mission-critical applications.

Aerospace, Defense & Technology Ecosystem
| 04
Permit
arrow-thin

Permitting Underway - MIDA Classification

In April 2026, O'Leary Digital secured classification of the development zone as a Military Installation Development Authority (MIDA), advancing state-level permitting and regulatory coordination, supported by Governor Spencer J. Cox and Utah's senior federal delegation.

Permitting Underway - MIDA Classification
| 05
Flex
arrow-thin

Single & Multi-Tenant Flexibility

Campus designed to accommodate dedicated single-tenant deployments or segmented multi-tenant configurations, fully adaptable to hyperscaler and enterprise requirements.

Single & Multi-Tenant Flexibility
| 06
Gov
arrow-thin

Strong State & Federal Government Support

Supported by Governor Cox, Senate President J. Stuart Adams, and US Senators Mike Lee and John R. Curtis. Utah leadership committed to enabling large-scale AI infrastructure.

Strong State & Federal Government Support
Utah
Alberta
| 01

Typical 500 MW Data Center Cluster

11 clusters across 2,500 acres. Each built to 500 MW with 55 individual 100 MW data centers, hybrid cooling, and N+1 redundancy across all critical systems.

A full-service downtown core designed to support the people who power the campus. Where work, life, and community meet.

| 02

Downtown Wonder Valley

| 03

Wildlife Preservation Area

Dedicated land set aside to protect natural animal movement, migration corridors, and the surrounding ecosystem.

7.5 GW dedicated behind the fence power generation.

| 04

Dedicated Power Corridor

A master-planned innovation district within Utah’s growing tech corridor, designed to support scalable digital infrastructure and evolving high-performance industry needs.

| 01

Downtown Wonder Valley

A hyperscale, high-density data center engineered for 500MW capacity, delivering secure, resilient, and energy-efficient infrastructure tailored for AI, cloud, and mission-critical enterprise workloads.

| 02

Typical 500MW Data Center

Built for Scale
Scale & Performance
| 01
Scale Data Shape
15+ GW

total planned power

02 |
Scale Data Shape
11 GW

IT load

03 |
Scale Data Shape
55

data center buildings per campus

04 |
Scale Data Shape
100 MW

per building

| 05
Hybrid cooling

Air + Liquid - Closed loop

06 |
Scale Data Shape
N+1

across critical systems

| 07
Designed Reliability

99.999% target availability

Built clean. Built to last.

Sustainability by Design

Sustainability isn’t an add-on, it’s engineered into every layer of O’Leary Digital campuses, from carbon-capture-ready power generation to water harvesting and community partnerships.

| 01
Carbon Designed for CCS
>40% Reduction of Emissions

Generation standards and efficiency integrated into design for reducing carbon footprint and increasing thermal efficiency.

Partners & Advisors World-Class Execution

An assembled bench of industry leaders, from architecture to capital markets, with proven track records delivering large-scale infrastructure.

Gensler

Master Plan Architect

Kent

Data Center Design Advisor

KPMG

Major Project Advisory

PCLPCL hover

Construction Management

Cencore

Security Engineering

Bennett Jones

Legal

Cantor Fitzgerald

Investment Banking

Aon

Risk Management

CSV

Midstream Natural Gas Supply

PWR

Electrical Engineering Consultan

Greenberg TraurigGreenberg Traurig hover

Legal

UBS

Invertment Banking

Beairsto & Associates

Civil Engineering